Title Image

Quality & ISO

Learn about our way of work
quality & iso
Our Quality Management System – ISO9001:2015

Quality is built into our processes at every level, and this ensures that your parts can fully meet your specifications. We carry out a First Article Inspection on every job, as well as in-batch checking for large production runs. All parts are subject to final inspection before they are released for delivery, including inspection of any processes carried out (e.g. plating and heat treatment).

We offer full material, part and process tracability in line with ISO9001:2015, and can provide certification for all of these upon request. This includes Certificates of Conformity, First Article Inspection Reports (FAIR), and 3.1 Mill Certificates for materials.

Our inspection department is fully equipped with calibrated inspection equipment, and we are currently in the process of building a temperature controlled inspection room which will house a new CNC Coordinate Measuring Machine (CMM)

NQA_ISO9001_CMYK

IMS Precision – Quality is No #1

Our highly dedicated and experienced team work closely with our customers, overcoming engineering challenges and helping bring your initial designs to fruition as finished products.

Operating from our fully-equipped engineering facility, we have the skills and capacity to undertake a wide range of precision engineering work for your business.

QUALITY STEP #1

Upon receipt of order drawings and models are checked for correct revision and format. Works order prepared and material sourced in line with customers’ requirements.

QUALITY STEP #2

The job goes into production. The first part is fully inspected and signed off at each stage of production. The works order stays with the job to ensure full traceability at all stages.

QUALITY STEP #3

When all parts are finished, they are returned for a full final inspection. Once signed off the works order is released for further processes, or delivery.

QUALITY STEP #4

Sub-Contract and auxiliary processes (e.g assembly, plating or heat treatment) are carried out by our approved suppliers, and are inspected again once these processes are complete.

QUALITY STEP #5

The goods are then checked against the customer order for conformity, and final paperwork is produced including and Certificates required. The job is now released for packing, delivery or collection.